Factory on Air

S01E11: Precise Production Planning

Season 1 Episode 11

This episode uncovers how manufacturers can transform chaotic, delay-prone schedules into precise, data-driven production plans—so orders ship on time, machines run at optimal capacity, and teams work without the constant fire-fighting. You’ll discover how real-time machine data, material availability checks, and “what-if” simulations turn planning from guesswork into a science. We’ll show the hidden impact of overloaded lines, stock shortages, and unbalanced shifts—and how to fix them before they derail performance.

Real-world success stories prove the approach works:

  • A packaging manufacturer cut order lead times by 20%.
  • A heavy industry plant reduced unplanned downtime by 15% with IoT-based cycle-time planning.
  • A cosmetics producer eliminated 80% of sudden stoppages by aligning schedules with component availability.

Without a precision planning framework, manufacturers often face:

  • Late deliveries and lost customer trust.
  • Idle machines or overtime caused by poor material coordination.
  • High variability between shifts due to fragmented instructions.
  • Costly re-planning and emergency logistics.

Tune in for a step-by-step playbook—from auditing your data sources and building a digital twin to simulating alternative schedules and rolling out AI-optimized plans—that turns production planning into a competitive advantage.

👉 Book a free session with a DBR77 expert and see our platform in action.
 📅 Let’s talk: Book a meeting

Podcasts we love

Check out these other fine podcasts recommended by us, not an algorithm.

Robosapiens Artwork

Robosapiens

Piotr Wiśniewski